I watched the installation of the first rotor blade to the latest (8th) wind turbine on the south-east corner of No.5 tank. It towers high above the horse paddock and the junction of Moorditch Lane and Marsh Lane. It will be the closest turbine to Frodsham village and its work even brought people out from their homes on Moreton Terrace off Marsh Lane.
The first bade is readied into position by the cranes whilst inside the top section an engineer is ready to insert the industrial pins into their slots.
An image from the west along No.5 tank.
All images: WSM.