Frodsham Marsh Wind Farm Construction: No.1 & 3 & 4 & 5 tanks (updated)

07.09.15. Windfarm construction, No.1 tank, Frodsham Marsh. Bill Morton., (4)

07.09.15. Windfarm construction, No.1 tank, Frodsham Marsh. Bill Morton., (5) 07.09.15. Windfarm construction, No.1 tank, Frodsham Marsh. Bill Morton., (1) - Copy 07.09.15. Windfarm construction, No.1 tank, Frodsham Marsh. Bill Morton., (3)If you have been birding on Frodsham Marsh during the week you will have heard the continues thud, thud sound of a pile driver. This is machine is inserting foundation supports for the construction of the bases for the wind turbines. Presently this is occuring on Lordship Marsh, No.4 tank and No.1 tank. I have included some images from No.1. tank.

10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (5)

10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (10) 10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (7) 10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (6)

10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (9)These images show work continuing on No.5 tank with the pile driver, earth digger and the building of the power house generator?

10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (3) 10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (4) 10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (2) 10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (1) 10.09.15. No.3 tank (mitigation), Frodsham Marsh. Bill Morton (3) 10.09.15. No.3 tank (mitigation), Frodsham Marsh. Bill Morton (2) 10.09.15. No.3 tank (mitigation), Frodsham Marsh. Bill Morton (1)

Over on No.3 tank and tilling of the soil here and the excavation of soil for scrapes?

12.09.15. Frodsham Marsh. Bill Morton (13) 12.09.15. Frodsham Marsh. Bill Morton (14) 12.09.15. Frodsham Marsh. Bill Morton (15) 12.09.15. Frodsham Marsh. Bill Morton (16)

Work on the foundations for No.4 tank wind farm is continuing and above are four images from that site.

10.09.15. Wind farm construction on Frodsham Marshes. Bill Morton (11)Thanks to Shaun Hickey for this image of a construction of a wind turbine (?) on Lordship Marsh.

All images except the last by WSM.

Enter sightings and comments

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.